SkillsLib.ai

Stormwater Compliance & Design Analyzer

Analyze stormwater designs against regulatory requirements and size detention basins

4.0(33 reviews)
500+ downloads
Updated Sep 2026
Verified SafeSecurity VerifiedThis skill was analyzed by our AI security scanner for harmful content including data exfiltration, system manipulation, credential theft, and prompt injection. No threats were detected.

What You Can Do

Verify stormwater designs against MS4 permits, local ordinances, and environmental standards in minutes rather than hours. Calculate detention basin volumes using SCS and rational methods, evaluate water quality treatment requirements, and identify specific design deficiencies with actionable recommendations. Generate technical justifications for variance requests and produce compliance documentation ready for regulatory submission.

Features

Regulatory Compliance Verification

Cross-references proposed designs against federal, state, and local stormwater ordinances and MS4 permit requirements

Detention Basin Sizing Calculations

Applies SCS and rational methods to compute required detention volumes for multiple storm events (2-yr, 10-yr, 25-yr, 100-yr)

Water Quality Treatment Analysis

Evaluates BMP selection and pollutant removal requirements based on jurisdictional standards

Compliance Gap Identification

Flags design deficiencies with specific regulatory citations and remediation pathways

Post-Construction BMP Assessment

Analyzes permanent stormwater management features for long-term performance and maintenance requirements

Design Alternative Comparison

Evaluates multiple design scenarios against the same regulatory framework to support value engineering

Variance Justification Documentation

Develops technical rationale for requested design waivers or non-standard approaches

Peak Discharge Rate Calculation

Computes runoff volumes and discharge rates across multiple design storms

Example Output

Example 1: Detention Basin Compliance Check

Project: 8-acre commercial development in King County, WA

  • 2-yr storm volume required: 2.1 acre-feet (per local ordinance)
  • Proposed detention basin: 2.3 acre-feet
  • ✅ Compliant — Exceeds minimum by 9.5%
  • Water quality treatment: Bioretention filter recommended
  • MS4 permit alignment: Meets flow control standard of 0.05 cfs/acre

Example 2: Compliance Gap Report

Project: Mixed-use redevelopment in Harris County, TX

  • ❌ Gap #1: Proposed basin lacks redundant outlet structure (Harris County Flood Control requirement)
  • ❌ Gap #2: Water quality treatment BMP not sized per TCEQ standards for parking lot runoff
  • ✅ Recommendation: Add secondary weir outlet; incorporate 0.5-inch treatment depth in sediment forebay
  • Timeline to compliance: Design modification required before permitting

Example 3: Alternative Comparison

Alternative A (surface detention): 3.1 acre-feet, 2.2% site coverage Alternative B (subsurface infiltration): 1.8 acre-feet, 0% visible footprint

  • Both meet 25-yr storm volume requirement (2.0 acre-feet)
  • Alternative B superior for dense urban context; requires infiltration test approval
  • Cost implications and maintenance burden documented for selection decision

What's Included

  • SKILL.md instruction file with regulatory framework mapping:
  • Detention basin sizing calculator (SCS, rational method, multiple storm events):
  • Regulatory requirement checklist template (federal, state, local tiers):
  • Water quality BMP selection and sizing worksheet:
  • Compliance gap report template with remediation tracking:
  • Design alternative comparison matrix:
  • Variance justification outline with citation library:

Who It's For

  • Environmental Engineers — Site-level stormwater design and regulatory compliance verification
  • Civil Design Professionals — Stormwater system layout and detention basin sizing for development projects
  • Permitting Specialists — Pre-submission compliance review and gap analysis before agency submittal
  • Project Managers — Cost and schedule impact assessment of design alternatives and compliance pathways
  • Water Resources Consultants — Technical support for complex stormwater designs and regulatory negotiations

Best For

  • New development and redevelopment stormwater management design reviews
  • Detention and retention basin sizing calculations across multiple storm events
  • Regulatory compliance verification against MS4 permits and local ordinances
  • Design alternative evaluation for value engineering and site optimization
  • Variance request justification and technical documentation for regulatory agencies
  • Post-construction BMP assessment and long-term performance evaluation

You might also like

Screenpipe Api
$25
Backend4.4(49)
Screenpipe Api

Query your local Screenpipe instance to retrieve screen recordings, audio transcriptions, UI element accessibility trees, keyboard/mouse input logs, and productivity analytics. You can search by keywords, filter by content type (audio, OCR, accessibility, input), set time ranges, and extract structured data about your applications, meetings, and work sessions without sending data to external servers.

Commercial Code Compliance Analyzer
$45
Commercial3.9(27)
Commercial Code Compliance Analyzer

You can submit architectural design documents, floor plans, and project parameters to receive a comprehensive compliance analysis that cross-references IBC, local amendments, zoning ordinances, and ADA accessibility requirements. Claude identifies specific gaps, cites applicable code sections, explains why each gap matters, and provides concrete remediation strategies—all before formal design review submission when corrections are costly and schedule-impacting.

Seismic Hazard Assessment & Ground Motion Analysis
$35
Earthquake4.2(35)
Seismic Hazard Assessment & Ground Motion Analysis

You can leverage Claude to synthesize regional seismic hazard data from authoritative sources (USGS maps, published studies), interpret probabilistic versus deterministic earthquake scenarios, and analyze how site conditions modify ground motions. Claude helps you justify seismic design parameters to clients and regulators, evaluate liquefaction and earthquake-induced landslide risks, and develop defensible recommendations aligned with ASCE 7 and current guidelines—accelerating report preparation without replacing specialized geotechnical software.

IDP Developer Experience Audit & Friction Point Analysis
$40
IDP Developer Experience Audit & Friction Point Analysis

You systematically evaluate your internal developer platform across dimensions like onboarding, deployment, tooling, and documentation to identify quantifiable friction points. Claude analyzes your platform's usability, creates a friction scoring matrix, and generates a prioritized improvement roadmap ranked by team impact and implementation effort. You get a data-driven strategy to reduce developer toil and accelerate delivery.

Timber Structural Analysis Assistant
$30
Timber3.7(29)
Timber Structural Analysis Assistant

This skill enables you to rapidly produce structural analyses for timber members, including bending, shear, compression, and combined stress calculations. You can determine lateral load capacity for shear walls, design connections, evaluate code compliance against NDS standards, assess serviceability limits, and generate calculation frameworks suitable for permit submission and engineer stamping.

Earth Retention System Designer
$35
Earth Retention System Designer

Design earth retention systems by inputting soil properties, site geometry, and regulatory requirements. Claude calculates lateral earth pressures using Coulomb, Rankine, and Mononobe-Okabe methods, verifies factors of safety for internal and external stability, compares competing retention concepts (gravity walls, cantilever, anchored, sheet-pile, soil-nail), and generates cost-benefit analysis and regulatory documentation packages ready for permit submission.

Pavement Design Analysis & Validation
$45
Pavement Design Analysis & Validation

Quickly evaluate pavement design scenarios using AASHTO 1993 methodology to calculate required structural thickness for flexible (asphalt) and rigid (concrete) pavements. Analyze traffic loading by computing Equivalent Single Axle Loads (ESALs), assess subgrade conditions through CBR interpretation, and compare multiple design alternatives with different material combinations to optimize cost and performance. Generate preliminary design documentation with technical justification for client presentations and design reports.

HVAC Load Calculation & Equipment Sizing Assistant
$30
HVAC3.9(32)
HVAC Load Calculation & Equipment Sizing Assistant

You can accelerate HVAC design workflows by inputting building parameters—envelope characteristics, occupancy data, climate conditions, and existing systems—and receiving calculated heating/cooling loads, equipment sizing recommendations, and zone-by-zone analysis. Claude organizes complex building data into actionable design parameters and specification summaries for client review, permit submission, and professional validation against ASHRAE and ACCA standards.

$30.00