SkillsLib.ai

Stormwater Permit Compliance Analyzer

Analyze stormwater plans against regulatory requirements and generate compliance documentation

4.1(33 reviews)
500+ downloads
Updated Oct 2026
Verified SafeSecurity VerifiedThis skill was analyzed by our AI security scanner for harmful content including data exfiltration, system manipulation, credential theft, and prompt injection. No threats were detected.

What You Can Do

You can systematically evaluate stormwater management plans against EPA Construction General Permit (CGP) requirements, state NPDES Phase I/II standards, and local municipal design standards. Claude analyzes BMP sizing, erosion control measures, stormwater quality volumes, and peak discharge compliance, then generates compliance matrices and documentation suitable for permit applications, regulatory submittals, and responses to agency comments.

Features

Regulatory compliance matrix generation

cross-references site plans against federal CGP, state NPDES, and local design standards with pass/fail assessments

BMP adequacy analysis

evaluates erosion control and stormwater treatment measures for sizing, placement, and performance standards compliance

Stormwater volume calculations review

assesses WQv, peak discharge, and detention sizing against permit thresholds and local requirements

Documentation gap identification

flags missing calculations, design justifications, maintenance plans, or monitoring protocols required for permit approval

Permit comment response generation

drafts technical responses to regulatory requests for additional information (RAI) with supporting calculations and citations

Site-phase compliance tracking

evaluates erosion control adequacy across construction phases and seasonal requirements

Design standard comparison

analyzes whether proposed LID measures, green infrastructure, or alternative BMPs meet jurisdiction-specific performance criteria

Compliance summary reports

produces executive summaries of findings formatted for permit applications and stakeholder communication

Example Output

Example 1: SWPPP Compliance Matrix

Permit RequirementSWMPP Addresses?Design Standard MetNotes
Sediment fence installation at disturbed perimeter✓✓Detailed in Section 3.2; spacing per EPA CGP requirements
Stormwater quality volume (WQv = 1.2 in)✓✗Proposed detention pond: 0.8 in; requires 0.4 in additional capacity
Construction entrance stabilization✓✓Construction road sweeping scheduled 3x/week

Example 2: Documentation Gap Report Missing Items for Permit Application:

  • Post-construction stormwater O&M plan (required per local ordinance Section 4.5)
  • Detailed BMP inspection frequency schedule (EPA CGP requires weekly during active construction)
  • Design engineer certification and responsible party contact

Example 3: Regulatory Comment Response Comment: "Stormwater quality treatment volume calculations do not clearly demonstrate compliance with state volume reduction standard."

Response: WQv calculation revised to 1.2 inches based on [local impervious acreage]. Proposed bioretention system (0.85 acres) and extended detention basin (0.35 acres) provide combined treatment of 1.22 inches, exceeding the 1.2-inch requirement by 0.02 inches. Detailed calculations provided in revised Appendix C.

What's Included

  • SKILL.md: Core instruction file with regulatory framework guidance and analysis workflows
  • Compliance Matrix Template: Pre-built spreadsheet structure for EPA CGP, state NPDES Phase I/II, and local standard cross-referencing
  • SWMPP/SWPPP Review Checklist: 50+ point inspection list covering erosion control, stormwater treatment, calculations, and documentation
  • BMP Sizing Verification Worksheet: Framework for evaluating sediment fence, inlet protection, detention basin, and bioretention adequacy
  • Documentation Gap Tracker: Template for logging missing calculations, certifications, O&M plans, and inspection schedules

Who It's For

  • Environmental engineers reviewing SWMPP/SWPPP submittals for compliance and permit readiness
  • Stormwater professionals preparing permit applications and regulatory submittals for construction projects
  • Project managers tracking stormwater compliance requirements across design and construction phases
  • Municipal reviewers evaluating contractor-submitted stormwater plans against local design standards
  • Compliance specialists responding to regulatory comments and requests for additional information (RAI)

Best For

  • Pre-application stormwater plan reviews and compliance gap analysis
  • Generating compliance matrices for EPA CGP and state NPDES permitting
  • Evaluating BMP sizing, placement, and erosion control measure adequacy
  • Identifying missing documentation, calculations, and design justifications before permit submission
  • Drafting technical responses to regulatory agency comments and requests for clarification

You might also like

Screenpipe Api
$25
Backend4.4(49)
Screenpipe Api

Query your local Screenpipe instance to retrieve screen recordings, audio transcriptions, UI element accessibility trees, keyboard/mouse input logs, and productivity analytics. You can search by keywords, filter by content type (audio, OCR, accessibility, input), set time ranges, and extract structured data about your applications, meetings, and work sessions without sending data to external servers.

Electrical Load Calculation & Equipment Sizing Assistant
$30
Electrical4.0(35)
Electrical Load Calculation & Equipment Sizing Assistant

This skill automates the detailed calculations required for electrical system design, converting connected loads to demand loads, sizing conductors and equipment per NEC standards, and analyzing voltage drop across feeders and branch circuits. You input project parameters and receive complete load schedules, equipment recommendations with ampacity ratings, conductor specifications, and code citations—eliminating manual calculation errors and enabling faster design iterations for permit-ready documentation.

Slope Stability Analysis Framework
$35
Slope Stability Analysis Framework

You can conduct comprehensive slope stability analyses that integrate site characterization, soil/rock properties, and quantitative calculations to evaluate both simple and complex slope geometries. The framework helps you identify critical failure mechanisms, calculate safety factors, assess groundwater and seismic effects, and develop technically defensible remediation recommendations suitable for permitting, design decisions, and stakeholder communication.

Pict Test Designer
$30
Pict Test Designer

You can systematically design test cases for any feature or system by analyzing requirements or code to extract test parameters, values, and business constraints. The skill generates a PICT model, executes pairwise testing logic to minimize test case count while maximizing coverage, and delivers a formatted test matrix with expected results—reducing manual test design effort while ensuring comprehensive scenario coverage.

Voice Dna Creator
$40
Voice Dna Creator

This skill deconstructs your writing samples to identify the specific patterns, personality markers, emotional range, language quirks, and formatting habits that make your voice uniquely yours. You'll receive a detailed voice DNA profile that includes your core communication style, signature phrases, emotional tone, formality level, and what you actively avoid—creating a blueprint that AI systems can use to replicate your authentic voice consistently across projects, platforms, and content types.

Timber Load Path Analysis & Verification
$45
Timber4.2(34)
Timber Load Path Analysis & Verification

You can decompose complex timber structures into analyzable load paths, trace forces from applied loads through members to supports, and calculate governing demands for each structural element. This skill helps you identify critical design points, apply appropriate load factors and duration adjustments, and create defensible design documentation that satisfies code officials and peer reviewers.

Sustainable Material Lifecycle Analyzer
$25
Sustainable Material Lifecycle Analyzer

You can compare building materials across embodied carbon, water usage, recyclability, supply chain impacts, and lifecycle costs—all grounded in industry standards like EN 15804 and ISO 14040/44. This skill transforms material selection from intuition-based guessing into data-driven specification, producing analysis outputs ready for client presentations, value engineering discussions, and regulatory compliance documentation.

HVAC Load Calculation & Equipment Sizing Assistant
$30
HVAC3.9(32)
HVAC Load Calculation & Equipment Sizing Assistant

You can accelerate HVAC design workflows by inputting building parameters—envelope characteristics, occupancy data, climate conditions, and existing systems—and receiving calculated heating/cooling loads, equipment sizing recommendations, and zone-by-zone analysis. Claude organizes complex building data into actionable design parameters and specification summaries for client review, permit submission, and professional validation against ASHRAE and ACCA standards.

$30.00